Projects

Electronic Arts expansion project (Gilmore at Sanderson Way)

Project Description
  • On site from March 2004 to April 2006.
  • General Contractor: PCL Ltd.
  • Retained when conventional systems did not satisfactorily address high discharge turbidity.
  • Blue clay type till encountered.
  • No site downtime after system installation.

Vancouver General Hospital (12th Avenue at Oak Street)

Project Description
  • On site from December 2004 to May 2005.
  • General Contractor: PCL Ltd.
  • Retained from the onset to address challenges presented by this very deep excavation project.
  • No site downtime after system installation.

Vancouver Convention Centre Project (Adjacent to the Pan Pacific Hotel)

Project Description
  • On site from October 2005 to June 2006.
  • General Contractor: PCL Ltd.
  • Retained when competitor did not satisfactorily address high discharge turbidity.
  • High profile environmentally sensitive site.
  • No site downtime after system installation.

200th Street/Golden Ears Bridge Project

Project Description
  • On site from May 2006 to April 2007.
  • General Contractor: Bilfinger Berger.
  • Retained from the onset to address challenges initially presented by the test piles required for this megaproject.
  • High profile environmentally sensitive site.
  • No site downtime after system installation.
  • This was a complex treatment system with removal of toxic vinyl chloride. We used our patented technology to remove toxic organics while managing the DO (dissolved oxygen) for aquatics.

Shangri-La Project (downtown Vancouver)

Project Description
  • Retained by the developer.
  • General Contractor: Ledcor.
  • Retained when competitor did not satisfactorily address high discharge turbidity.
  • Highest tower in Vancouver.
  • 80, 000 cubic metres of material excavated.
  • No site downtime after system installation.

Olympic Village Project

Project Description
  • On site from February 2007 to October 2008.
  • General Contractor: Metrocan Construction.
  • Retained from the onset to address challenges initially presented by soil conditions at this megaproject.
  • High profile environmentally sensitive site.
  • Effluent water quality held to drinking water standards.
  • No site downtime after system installation.

Still Creek Drive (Slough Estates) at Willingdon Avenue

Project Description
  • On site from May 2008 to October 2009.
  • General Contractor: Stuart Olson.
  • Retained from the onset to address challenges presented by the proximity to Still Creek coupled by the ground conditions (peat concerns and hog fuel contaminants).
  • High profile environmentally sensitive site.
  • No site downtime after system installation.

Metrotower 3 (Metrotown, Burnaby)

Project Description
  • On site from 2008 to 2014.
  • General Contractor: Ledcor.
  • Retained from the onset to address challenges relating to this megaproject.
  • No site downtime after system installation.