Projects
Electronic Arts expansion project (Gilmore at Sanderson Way)
Project Description
- On site from March 2004 to April 2006.
- General Contractor: PCL Ltd.
- Retained when conventional systems did not satisfactorily address high discharge turbidity.
- Blue clay type till encountered.
- No site downtime after system installation.
Vancouver General Hospital (12th Avenue at Oak Street)
Project Description
- On site from December 2004 to May 2005.
- General Contractor: PCL Ltd.
- Retained from the onset to address challenges presented by this very deep excavation project.
- No site downtime after system installation.
Vancouver Convention Centre Project (Adjacent to the Pan Pacific Hotel)
Project Description
- On site from October 2005 to June 2006.
- General Contractor: PCL Ltd.
- Retained when competitor did not satisfactorily address high discharge turbidity.
- High profile environmentally sensitive site.
- No site downtime after system installation.
200th Street/Golden Ears Bridge Project
Project Description
- On site from May 2006 to April 2007.
- General Contractor: Bilfinger Berger.
- Retained from the onset to address challenges initially presented by the test piles required for this megaproject.
- High profile environmentally sensitive site.
- No site downtime after system installation.
- This was a complex treatment system with removal of toxic vinyl chloride. We used our patented technology to remove toxic organics while managing the DO (dissolved oxygen) for aquatics.
Shangri-La Project (downtown Vancouver)
Project Description
- Retained by the developer.
- General Contractor: Ledcor.
- Retained when competitor did not satisfactorily address high discharge turbidity.
- Highest tower in Vancouver.
- 80, 000 cubic metres of material excavated.
- No site downtime after system installation.
Olympic Village Project
Project Description
- On site from February 2007 to October 2008.
- General Contractor: Metrocan Construction.
- Retained from the onset to address challenges initially presented by soil conditions at this megaproject.
- High profile environmentally sensitive site.
- Effluent water quality held to drinking water standards.
- No site downtime after system installation.
Still Creek Drive (Slough Estates) at Willingdon Avenue
Project Description
- On site from May 2008 to October 2009.
- General Contractor: Stuart Olson.
- Retained from the onset to address challenges presented by the proximity to Still Creek coupled by the ground conditions (peat concerns and hog fuel contaminants).
- High profile environmentally sensitive site.
- No site downtime after system installation.
Metrotower 3 (Metrotown, Burnaby)
Project Description
- On site from 2008 to 2014.
- General Contractor: Ledcor.
- Retained from the onset to address challenges relating to this megaproject.
- No site downtime after system installation.